TPO Roofing

Sixty Mil or Eighty: Choosing TPO Thickness — Quick Reference

· Roofing Expert

Sixty Mil or Eighty: Choosing TPO Thickness — Quick Reference

How to read an estimate for a TPO roof in Laurel Canyon, and what to compare line by line.

Choosing a roofer is mostly a matter of reading estimates properly, which nobody teaches. For a TPO roof in Laurel Canyon, this is what to compare and what to ignore.

What actually matters

Membrane thickness, insulation build-up and the number of penetrations to detail around set the price. Sixty mil rather than forty-five is a small percentage on the quote and a large difference in puncture resistance.

The detail that is usually left out

Read the exclusions before the total. The cheapest quote and the best quote are occasionally the same document, and the exclusions are how you tell. Weld testing is the item to insist on. A probe run along every seam while the crew is still on site costs nothing and finds the cold welds that would otherwise be discovered by a tenant in December. Ask how it will be handled in writing, and the rest of the job tends to go the same way.

What is specific to Laurel Canyon

Pacoima sits on the flat below Beverly Glen, where the ground is level, the summers are long and hot, and the Sherman Oaks wind runs straight through with nothing to slow it. Those wind events are the single most common reason we get storm calls out of this area. Older single-storey stock alongside newer infill, and the failure patterns on each have almost nothing in common.

What we look at before quoting

  • Seam integrity, probed along the full length rather than spot-checked
  • Punctures and abrasion, especially on traffic routes to rooftop plant
  • Membrane shrinkage and any resulting tension at the perimeter
  • Flashing and termination bar at every wall, curb and upstand
  • Drain sumps and clamping rings, checked and clear
  • Fastener plates showing through the membrane surface
  • Weathering and chalking of the surface, particularly on exposed elevations

Common questions

What should I check before signing?

Licence status, that the written scope matches what was discussed, and that deck repair is priced per sheet rather than left open.

Is a deposit normal?

A reasonable one is. What is not normal is a large payment before materials are on site, and California limits what can be asked for up front.

The honest summary

TPO is a good system installed properly and an expensive mistake installed quickly. Seams and punctures decide its life, so protect the surface and test the welds. In Laurel Canyon the thing to watch is wind-side edge detail, ridge fixing, and how much the drainage is carrying.

Want this looked at properly?

Free inspection, drone photography where access is difficult, and a written estimate with deck repair priced per sheet. No obligation.

More on TPO Roofing

← All posts

(818) 683-2039Text Us